Replenishment Planning: Reorder Points, Min-Max and Simulating Policies
Replenishment is the routine that turns a forecast and a stock position into purchase or production orders. A policy answers two questions: when do we order, and how much? Policies are simple to state, but the best one depends on costs, lead times and supplier rules, and its performance is hard to judge by reasoning alone. This article defines the common policies, explains where the economic order quantity (EOQ) stops being reliable, and shows how to compare policies by simulating them on synthetic demand.
The common policies
Each policy works on the inventory position: stock on hand plus stock on order, minus backorders. Using the position rather than on-hand stock avoids ordering twice for the same shortfall.
- Reorder point, fixed quantity, written (s,Q). Review continuously. When the position falls to
sor below, orderQ. - Min-max, or (s,S). When the position falls to
s(the minimum), order enough to reachS(the maximum). The order size varies with how far the position has fallen. - Periodic order-up-to, (R,S). Every
Rdays, order enough to bring the position up toS, whatever it is. Common when suppliers deliver on a fixed schedule or items share a truck.
The reorder point must cover demand over the lead time plus safety stock: s = mean demand during lead time + safety stock. With periodic review, the order-up-to level must cover the lead time plus the review period, because a shortage can develop before the next review.
EOQ and its limits
By convention, the EOQ balances ordering cost against holding cost under textbook assumptions: constant, known demand, a fixed cost per order, holding cost proportional to stock, no shortages and no quantity discounts:
EOQ = sqrt( 2 x D x K / h )
where D is annual demand, K the cost per order, and h the holding cost per unit per year. It is a good starting point because total cost is flat near the optimum. In our example below, D = 7,300 units, K = 50 and h = 7.3 a year, so the EOQ is 316 units. Total ordering plus holding cost (cycle stock only) is 2,308 a year at 316, 2,981 at 150 and 2,798 at 600. Cutting the quantity to 150 (under half) costs 29 percent more, while raising it to 600 (almost double) costs 21 percent more.
EOQ stops being reliable when demand is highly variable or seasonal, when suppliers impose minimum order quantities or case sizes, when price breaks matter, when storage is constrained, or when ordering cost is not really a fixed amount. Treat it as a first estimate of Q and test it.
Why simulate
A formula gives you the cost of a policy under tidy assumptions. A simulation lets you add lumpy demand, variable lead times, review schedules and supplier rules, and count what actually happens: orders placed, stock held, units lost. The method is plain:
- Generate demand and lead times that look like your item, with a fixed random seed.
- Run each policy day by day: receive arrivals, serve demand, record holding cost and lost sales, review, order.
- Search a grid of policy parameters, using the same demand for every candidate so comparisons are fair.
- Report cost and service together, and prefer a policy that wins on both or states the trade-off.
Illustrative example with synthetic data
We simulated one item with daily demand averaging 20 units and a standard deviation of about 9.2, with a lead time of 4, 5 or 6 days at random. Ordering cost is 50 per order, holding cost 0.02 per unit per day, and each unit of unmet demand is lost at a penalty of 3. Each setting was run for 40 independent years after a 60-day warm-up, and results are averages.
Figure 1. One simulated stretch of an (s,Q) policy: stock falls with demand, an order is placed at the reorder point, and it arrives after a variable lead time. Synthetic data.
First, the (s,Q) policy with Q fixed at the EOQ of 316, varying the reorder point:
| Reorder point s | Fill rate | Annual cost |
|---|---|---|
| 80 | 94.9% | 3,290 |
| 100 | 97.9% | 2,758 |
| 120 | 99.4% | 2,573 |
| 140 | 99.9% | 2,625 |
Cost falls as lost sales vanish, then rises again as holding cost takes over. The minimum is at s = 120, which is the mean lead-time demand of 100 plus 20 units of safety stock.
Figure 2. Total cost falls as the lost-sales penalty disappears, then rises with holding cost. Synthetic data.
Next, three policies, each with its own cost-minimising parameter (searched in steps of 10 units for s and 15 units for S):
| Policy | Best parameter | Orders a year | Fill rate | Annual cost |
|---|---|---|---|---|
| (s,Q) continuous review, Q = 316 | s = 120 | 22.7 | 99.4% | 2,573 |
| (s,S) reviewed weekly, S = s + 316 | s = 220 | 18.2 | 99.3% | 2,870 |
| (R,S) weekly order-up-to | S = 285 | 52.0 | 99.6% | 3,605 |
Figure 3. Annual cost by policy, split into ordering, holding and lost-sales components, with fill rate above each bar. Synthetic data.
Under these assumptions continuous review is cheapest. Note that the (s,S) policy here is checked only once a week (a variant sometimes written (R,s,S)), so this comparison mainly shows the effect of the review period rather than of min-max as such. Weekly review forces the (s,S) policy to hold a higher reorder point (220 against 120) to protect against stock-outs between reviews, which adds holding cost. The weekly order-up-to policy places an order every week, 52 a year, and the ordering cost of 2,600 dominates. This does not mean periodic review is poor in general: if the ordering cost per line is lower, or a weekly truck is already paid for, the result changes. The value of the simulation is that you can test your own costs.
Finally, a supplier minimum. If the supplier requires 500 units per order, the best (s,Q) policy with Q = 500 still uses s = 120, places 14.4 orders a year, reaches a 99.6 percent fill rate and costs 2,809, which is 236 more than at the EOQ. That is a cost you can put in front of procurement when negotiating.
What goes wrong
- Optimising on one history. Parameters tuned to a single demand sample look better than they are. Use many replications or a hold-out period.
- Ignoring lead time variability. Using the average lead time understates the reorder point needed.
- Treating the penalty cost as fact. Shortage cost is a judgement. Show how the answer changes if it is halved or doubled.
- Forgetting the review period. With periodic review, protection must cover the lead time plus the review interval.
- Hidden constraints. Case packs, pallet sizes and shared transport change the real order quantity.
- Too many parameters to maintain. A policy no one can explain tends to be overridden.
How to start
- Pick one item family and estimate demand, lead time, ordering and holding costs.
- Compute the EOQ and a starting reorder point.
- Write a short daily simulation and compare (s,Q), min-max and periodic review, using fixed seeds.
- Test your real supplier constraints as scenarios.
- Pilot the winning policy on a small group of items and track cost and fill rate against the simulation.
An illustrative project
A hypothetical distributor replenishes thousands of items with a single weekly order-up-to rule. A team simulates the alternatives for each class of item: continuous reorder-point logic for fast movers with costly shortages, min-max for slow movers on shared trucks, and periodic review where supplier schedules are fixed. The test is whether inventory value falls without lowering fill rate over a pilot quarter. This is a synthetic scenario, not client work. Planners can run this kind of policy comparison in a tool such as SLICE Optimise, part of StratLytics Intelligent Chain Engine (SLICE).