A demand response event asks customers to use less electricity for a few hours. Whether they did cannot be read off the meter, because what they would have used without the event never happened. That counterfactual is the baseline, and every payment and programme evaluation rests on it. This article covers common baseline methods, how baseline error becomes payment error, how test and control designs avoid the problem, and what rebound and fatigue do to the picture, with a worked comparison on synthetic data.

Measured reduction is baseline minus actual

For each event interval:

reduction(t) = baseline(t) - actual(t)
payment      = sum over event intervals of reduction(t) x price

The actual is metered. The baseline is a model. Any baseline error passes one-for-one into the reduction and the payment: a baseline 1 MWh too high over an event overpays by 1 MWh. Because a typical response is a modest share of load, a small baseline error can be a large share of the response.

A four-step flow from interval meter data to baseline, adjustment and measured reduction, with notes that the baseline is a model and that its error passes into payment.

Figure 1. From meter data to payment: the baseline sits in the middle and its error flows to the end. Illustration.

Baseline methods

High X of Y. In the form used here, look back over the Y most recent eligible days (usually non-event weekdays), keep the X days with the highest usage in the event window, and average those days hour by hour. “High 4 of 5” uses the four busiest of the last five. Choosing the high-use days is a deliberate correction, because event days tend to be hot and busy. It is simple to audit and needs no weather feed.

Adjustment factors. A same-day adjustment scales the baseline by how the customer was behaving earlier on the event day. The form used here is the ratio of actual to baseline load in a window of hours before the event, capped (for example at 0.8 to 1.2) so that one odd morning does not dominate. Exclude the hours just before the event if customers pre-cool or pre-heat in anticipation, or the adjustment absorbs part of the response.

Regression baselines. Fit load against temperature (and calendar terms) on recent non-event days, hour by hour, then predict the event hours using the event day’s weather. This handles hot days properly but needs weather data, and a model fitted on a few weeks carries sampling error.

Test and control. Randomly assign customers to a called group and an uncalled group. The control group’s load on the event day is the baseline, optionally scaled by the ratio of the two groups’ loads on comparable non-event days. Because the control group lives through the same weather and business day, most baseline problems disappear. The cost is that some customers are deliberately not called, and you must be able to randomise.

Test any baseline against days with no event

You cannot check a baseline on an event day, but you can on days with no event. Run the method as if an event happened (a placebo event), compare the “reduction” to zero, and express the errors as a share of baseline, on typical days and on hot days, because events are called when conditions are unusual.

A worked example on synthetic data

The dataset has 300 customers, 120 summer days, hourly values, and randomly assigned groups of 150 treated and 150 control. The two groups’ loads were in the ratio 0.996 on non-event weekdays. Eight events ran on the hottest weekdays (mean daily temperature 29.9 C against 25.3 C for eligible baseline days) from 15:00 to 19:00. Because this is a simulation, the true no-event load of the treated group is known, so each method can be scored against the truth. The response, its decline across events, pre-cooling and rebound are all assumptions planted in the simulation, so the results show how the methods behave, not typical programme values. The planted response averages 11.85 percent of event-window load across the events, a true reduction of 33.42 MWh in total. At an illustrative 150 currency units per MWh, the true payment is 5,013.

Four baselines were applied: high 4 of 5; the same with a morning adjustment (hours 10 to 12, capped 0.8 to 1.2); a regression on same-hour temperature over the non-event weekdays in the previous 40 days; and the control group scaled by the groups’ hourly ratio on those same days.

Hourly load for the treated group on 28 August 2026. The unadjusted baseline falls below the true no-event load during the event, while the adjusted baseline tracks it.

Figure 2. One event day (28 August 2026). The unadjusted high-4-of-5 baseline sits under the true counterfactual in the event hours, so it understates the reduction. Synthetic data.

Method                  Total MWh   vs true    Payment diff   Mean abs error
                                                (units)        per event (MWh)
True reduction            33.42        -            -              -
High 4 of 5               18.54     -44.5%       -2,232           1.92
High 4 of 5 + morning     33.69      +0.8%          +40           0.20
Regression with weather   33.42      0.0%            -1           0.79
Control group             33.08      -1.0%          -51           0.25

The unadjusted baseline is built from cooler days than the event days, so it is too low, and it credits the programme with 44.5 percent less than was delivered. The adjustment repairs that because the morning load carries the day’s weather. The regression is right in total but wrong event by event (0.79 MWh on average), so totals flatter it. The control group (0.25 MWh per event) and the adjusted baseline (0.20) are the most accurate per event.

Bars of average absolute baseline error on no-event days for four methods, on all 48 no-event weekdays and on the twelve hottest of them.

Figure 3. Placebo test: average absolute error as a percentage of baseline on days with no event, all 48 no-event weekdays against the 12 hottest of them. Synthetic data.

The placebo test gives much the same ordering. High 4 of 5 averaged a 4.5 percent absolute error on all 48 days and on the 12 hottest, the adjusted version 0.8 and 0.9 percent, regression 1.7 and 2.2 percent, and the control group 0.6 and 0.5 percent. On the hot days the unadjusted baseline averaged 3.1 percent too low. A 4.5 percent error looks small until it is set against a response of about 12 percent of load: it is roughly 40 percent of the thing being measured. That is why the error should be judged relative to the size of the response.

Rebound and fatigue

Customers rarely just stop using energy. In this dataset, pre-cooling added 5.81 MWh before the events and rebound added 7.82 MWh in the two hours after, which is 23.4 percent of the reduction. Net energy saved was 19.80 MWh, not 33.42. For a programme paid on peak reduction this may not matter; for one claiming energy savings it does. Measure two hours either side of the window and say which claim you make.

Response also declines with repeated calls. Here the planted response falls from 15.0 to 8.7 percent of load across the eight events.

True and estimated reductions for eight events. The control group estimate follows the declining true reduction; the unadjusted baseline estimate is erratic and low.

Figure 4. Reduction by event number. The true reduction falls from 5.31 to 2.86 MWh; the control group estimate tracks that decline (5.67 to 3.11 MWh), while the unadjusted baseline hides it. Synthetic data.

A drifting baseline can hide or invent fatigue, so, in our view, keep a control group when you can.

Event targeting

Calling events on the hottest days is understandable, but it creates the bias above, because those days differ from the days the baseline was built on. Our suggestion: target on forecast peak load, not only temperature; rotate customers so no group is called every time; and keep comparable no-event days to test the baseline.

What goes wrong

  • Baseline from unlike days. Hot event days against mild baseline days understate the response.
  • Gaming. Raising usage on baseline days raises the payment. Caps and exclusions help.
  • Adjustment absorbing the response. Morning windows that include pre-cooling hours.
  • Judging by totals. Errors that cancel across events hide event-level misses.
  • Ignoring rebound. Reported savings that include only the event window.

How to start

  1. Write down the baseline rule as a formula, with eligible days, window and caps, before the first event.
  2. Run placebo events on historical data, on typical and hot days.
  3. Express baseline error as a share of the expected response.
  4. Where it is practical, randomise a control group.
  5. Report rebound and the trend in response across events.

An illustrative project

This is an illustrative scenario built on synthetic data. It does not describe a specific client.

A demand response manager runs a summer programme with a high-4-of-5 rule and sees reductions that fall each event. Before blaming fatigue, the team runs placebo events on historical hot days, finds a consistent under-estimate, adds a morning adjustment, and holds back a random tenth of customers from the next two events as a control. They report the adjusted reduction, the control-based reduction and the rebound side by side.

SLIQ (StratLytics Intelligence for Quantum Grid) supports load forecasting, energy disaggregation, demand response optimisation and grid visibility.