Expected Credit Loss: CECL and IFRS 9 Compared, and How Loss Models Are Built
Expected credit loss (ECL) is now the basis for loan loss allowances under both US GAAP (CECL) and IFRS 9. The two standards share a goal, which is to recognise credit losses earlier and with more forward-looking information than the older incurred loss approach. They differ in structure. This article compares them in plain terms, shows how a loss model turns data into an allowance, and covers scenarios, overlays and the model risk problems that most often cause trouble.
CECL and IFRS 9 in plain terms
The FASB’s own background material for its post-implementation review says Accounting Standards Update 2016-13 replaced the incurred loss model with CECL, and that CECL was intended to require timely recognition of lifetime expected credit losses for assets measured at amortised cost. It removed the “probable” threshold for recognising credit losses and gave flexibility in estimation methods. It also requires an entity to consider forward-looking information, not only past and current events. Where an asset’s contractual life runs beyond the period for which reasonable and supportable forecasts can be obtained, the entity may revert to historical loss information, using either straight-line or immediate reversion.
The IASB’s July 2024 review of IFRS 9 impairment describes a different structure. An entity recognises at least 12-month expected credit losses throughout the life of an instrument, and lifetime expected credit losses once there has been a significant increase in credit risk since initial recognition. The review found that almost all stakeholders said the principle-based requirements work well in practice, with no fatal flaws identified, though many reported diversity in application.
Interpretation (ours, not regulator text): the practical difference is a trigger. Under IFRS 9 a loan sits in a lower-allowance bucket until something changes, so the staging test (and the data behind it) becomes a key control. Under CECL there is no staging test, so the pressure moves to the length of the forecast horizon, the reversion method and the segmentation of pools. Both need the same raw ingredients: loss history, current exposure data and a view of the economy.
Figure 1. How the two measurement structures differ. The stage numbers are common market labels rather than terms defined in IFRS 9. Illustration.
How a loss model is built
Most institutions build ECL from three components, or from a simpler loss-rate shortcut.
- PD (probability of default): the chance a borrower defaults in a given period, estimated from history by segment or score band.
- LGD (loss given default): the share of the exposure lost after recoveries and costs.
- EAD (exposure at default): the balance outstanding when default occurs, which falls as a term loan amortises and may rise for undrawn lines.
For each future period, expected loss is the probability of surviving to the start of the period, times the probability of defaulting during it, times LGD, times EAD, discounted. Written out:
ECL = sum over periods t of S(t-1) × PD(t) × LGD × EAD(t) / (1 + r)^t
where S(t-1) is the survival probability to the start of period t and r is the discount rate (under IFRS 9, the effective interest rate). Simpler methods apply a loss rate to a pool, often built from vintage analysis, which tracks cumulative losses for loans originated in the same period as they age. Vintage and loss-rate methods suit homogeneous retail pools. PD, LGD and EAD suit portfolios where borrower-level risk drivers and exposure profiles differ.
Illustrative example with synthetic data
We simulated a pool of 20,000 loans (Python, fixed seed 42), each with three years of remaining life, a total balance of 114.1m (currency units) and three risk grades with annual default probabilities of 1.0%, 2.5% and 6.0% in proportions of 50%, 35% and 15%. We estimated the marginal PD for each year from the simulated defaults, then assumed straight-line amortisation, a 45% LGD and a 5% discount rate.
| Year | Marginal PD | ECL contribution (m) |
|---|---|---|
| 1 | 2.31% | 1.13 |
| 2 | 2.15% | 0.65 |
| 3 | 2.36% | 0.33 |
The 12-month ECL is 1.13m (0.99% of the balance). The lifetime ECL is 2.11m (1.85%). That gap is the difference between an IFRS 9 stage 1 allowance and a stage 2 or CECL allowance for the same pool. The marginal PD rows are simulation estimates, so small differences between years are sampling noise rather than a finding.
Figure 2. Yearly ECL contributions and the cumulative total for the synthetic pool. Synthetic data.
Scenarios and overlays
IFRS 9 requires an estimate that is unbiased and probability-weighted, determined by evaluating a range of possible outcomes. The IASB review noted that judgement is needed on the number of scenarios and their probabilities, and that stakeholders reported diversity in practice on the number of scenarios, the variables used and the weights.
We show why with the same pool. Three scenarios scale the PDs and change the LGD: upside (PDs times 0.7, LGD 40%, weight 30%), base (times 1.0, 45%, 50%) and downside (times 1.8, 60%, 20%). Lifetime ECL is 1.32m, 2.11m and 5.02m. The probability-weighted result is 2.46m. A single run at the weighted-average inputs (PDs times 1.07, LGD 46.5%) gives 2.34m, which is 0.12m lower, because PD and LGD rise together in the downside, so loss rises faster than either input. The effect is a feature of the synthetic numbers, but the lesson is general: averaging the scenarios’ inputs is not the same as averaging their outcomes.
Figure 3. Scenario outcomes and the non-linearity of weighting. Synthetic data.
The review also found that many stakeholders reported entities increasingly using post-model adjustments, or management overlays, to capture emerging risks, which stakeholders described as helpful where models lack data or have limitations. The same stakeholders reported diversity in how overlays are recognised and repurposed, and a lack of transparency about why they are recognised and how large they are. The IASB decided not to amend IFRS 9 for overlays, but to consider improvements to disclosure.
In its 2025 stress test, the Bank of England’s participant guidance specifies that banks assume perfect foresight of the five-year economic path and a 100% weight on the stress scenario when projecting IFRS 9 provisions. That is a stress test convention, not the financial reporting rule.
What goes wrong
The points below are our interpretation and experience-based, not regulator text.
- Stale or thin history. Models fitted on benign years under-react to a downturn. Pools with few defaults give unstable PDs.
- Staging that does not match the model. A trigger based on days past due may lag the score the model uses, so allowance moves late and in jumps.
- Reversion without testing. Moving abruptly to historical loss rates after the forecast period creates a cliff in the allowance.
- Unexplained overlays. Adjustments that are large, permanent or poorly documented signal that the model is not fit for purpose.
- Scenario weights chosen to reach a number. If weights shift to land on a target, the process is no longer probability-weighted.
- Weak model risk governance. The Federal Reserve’s letter SR 26-2 takes a risk-based approach to model risk management tailored to a banking organisation’s model risk profile, so ECL models still need validation, monitoring and clear ownership proportionate to their materiality.
An illustrative project
This is an anonymised, synthetic scenario, not real client work. A mid-sized lender with a mixed retail and small business book moves its allowance process from spreadsheets to a governed model. The team starts by reconciling loan-level data to the ledger, then builds a vintage-based loss-rate model for the retail pools and a PD, LGD and EAD model for the business book. They run the new results in parallel with the old process for two reporting cycles, document each overlay with an owner and an expiry date, and agree scenario weights with finance and risk before reviewing the numbers. Independent validation tests the segmentation, the reversion method and the sensitivity of the allowance to the downside weight.
How to start
- Inventory the portfolios, their lives and the loss data you hold, and reconcile the data to the ledger.
- Pick the simplest method that fits each pool, and write down why.
- Test sensitivity of the allowance to the forecast horizon, reversion method, scenario weights and LGD.
- Set a rule for overlays: owner, rationale, size, expiry, and a plan to bring them into the model.
- Plan validation and monitoring before the first production run. StratLytics Enterprise Risk Analytics (SLERA) is one option for managing these workflows.
Sources
- FASB, Post-Implementation Review of Topic 326, Credit Losses, Third Public Roundtable handout, 12 May 2026, checked on 24 November 2026.
- IASB, Post-implementation Review of IFRS 9, Impairment: Project Summary and Feedback Statement, July 2024, checked on 24 November 2026.
- Bank of England, Guidance on the 2025 stress test for participants, checked on 24 November 2026.
- Federal Reserve, SR 26-2, Revised Guidance on Model Risk Management, checked on 24 November 2026.
General information, not legal advice.