Credit line optimisation: increases, decreases and the risk-revenue trade-off
A credit line decision looks simple: raise the limit for good customers, lower it for risky ones. In practice every increase adds revenue and risk at the same time, and the two do not move together across the portfolio. The job of line optimisation is to put each extra unit of exposure where it earns the most after expected loss, within limits the business has chosen to live with.
This article sets out the method, works through a small numerical example, and describes what typically goes wrong. It is written for analysts who will build the logic and managers who will decide how far to trust it.
The core idea: expected value per account
For each account, and for each candidate action, estimate the incremental economics over a fixed horizon:
Net value = incremental revenue - incremental expected loss - incremental cost
Incremental revenue = yield x extra balance
Incremental expected loss = (PD_new x EAD_new - PD_old x EAD_old) x LGD
Here PD is the probability of default over the horizon, EAD is the exposure at default (the balance expected to be outstanding if default happens), and LGD is the share of that exposure lost. “Incremental” matters: the question is never whether an account is profitable, but whether the change in limit makes it more profitable.
Three things make the estimate harder than it looks.
- Extra balance is not the extra limit. Customers draw only part of an increase, and that part varies by segment. Model the drawdown directly, from past increases.
- PD changes with the limit. Higher limits can raise default risk for some customers, partly because a larger balance is harder to service. A PD taken from a standard scorecard at the old limit understates this.
- Selection bias. Customers who received increases in the past were chosen by rules, so their later performance cannot be read as the effect of the increase. Randomised testing is the clean answer.
Decreases follow the same logic in reverse. A reduction removes unused exposure, which only helps if the customer might have drawn it. It also costs revenue and can lose the relationship. The value is the expected loss avoided on balances that would otherwise have been drawn, less lost revenue and attrition cost.
Worked example
Illustrative example with synthetic data. We generated 12,000 accounts in three risk bands (A low, B medium, C high; 5,000, 4,000 and 3,000 accounts) with a fixed random seed. Half of each band, chosen at random, received a limit increase in a pilot. Assumptions: 12-month horizon, yield of 18% on extra balance, LGD of 80%, and no incremental cost, so net value is revenue less expected loss. Mean balances stand in for EAD, which is a simplification. The generator assumes true 12-month default rates of 1.0%, 4.0% and 12.0% without an increase and 1.15%, 5.2% and 16.5% with one, so the observed rates below differ from these by sampling noise.
| Band | Pilot accounts per arm | 12-month default rate, control | 12-month default rate, increased | Mean current balance | Mean extra balance |
|---|---|---|---|---|---|
| A | 2,500 | 0.84% | 0.68% | 1,482 | 425 |
| B | 2,000 | 4.10% | 5.85% | 1,495 | 314 |
| C | 1,500 | 12.53% | 17.20% | 1,489 | 223 |
Take band B. Incremental revenue is 0.18 x 314 = 56.55. Incremental expected loss is (0.0585 x (1,495 + 314) - 0.0410 x 1,495) x 0.80 = 35.63. Net value per account is 56.55 - 35.63 = 20.91.
| Band | Revenue per account | Expected loss per account | Net value per account | Net per unit of extra exposure |
|---|---|---|---|---|
| A | 76.52 | 0.42 | 76.11 | 0.179 |
| B | 56.55 | 35.63 | 20.91 | 0.067 |
| C | 40.07 | 86.21 | -46.14 | -0.207 |
Band C destroys value even though it draws balances and generates revenue. Band A looks almost free, but note that the treated group in band A had a lower default rate than control (17 defaults against 21 in 2,500 accounts each). That is noise: the generator raised band A’s true default rate with the increase, and the observed difference is well within chance. Taking it literally would overstate band A’s value, so a careful analyst would shrink it towards the portfolio-wide relationship before relying on it.
Figure 1. Revenue, expected loss and net value per account by band: the same extra balance earns less than it costs in band C. Synthetic data.
Adding a constraint
Suppose the business will accept at most 2.5 million of additional exposure in total. Rank bands by net value per unit of exposure and fill the budget in that order.
- Band A, all 5,000 accounts: extra exposure of 2,125,669 and expected net value of about 380,544.
- That leaves 374,331. At about 314 of extra balance per band B account (314.16 before rounding), this funds 1,191 band B accounts, adding about 24,909.
- Band C receives nothing.
Total expected net value is about 405,452, from 6,191 increases.
Figure 2. Ranking by net value per unit of exposure and filling the 2.5 million budget in that order. Synthetic data.
This is the logic of a knapsack problem: maximise value subject to a resource limit. With many segments and several constraints (see below) a linear or integer programme replaces the manual ranking, but the idea is unchanged.
Constraints that shape real decisions
- Exposure budgets by portfolio, product or risk grade.
- Capital and provisioning impact, because larger limits raise expected loss and may raise required provisions under whatever accounting and prudential framework applies to you.
- Fairness and conduct requirements. Confirm with your compliance function which rules apply to your jurisdiction and product; this article does not set them out.
- Customer-level caps, such as maximum limit multiples or affordability checks.
- Operational limits, such as the number of accounts that can be reviewed or contacted each cycle.
Testing
Randomise within strata. Hold out a control group in every band that is eligible for an increase, and keep it for the full outcome window.
Figure 3. Test design and allocation flow, from randomised pilot to budget-constrained rollout.
Plan the sample size before the pilot. For a two-sided test at 5% significance and 80% power, the accounts needed per arm are approximately:
n = (1.96 x sqrt(2 x p_bar x (1 - p_bar)) + 0.84 x sqrt(p1 x (1 - p1) + p2 x (1 - p2)))^2 / (p2 - p1)^2
where p1 and p2 are the default rates you want to distinguish and p_bar is their average. To detect 4.0% against 5.2% in band B, the formula gives about 4,777 accounts per arm, more than the 2,000 in our pilot. The pilot happened to show a larger gap, but a smaller true effect would have been missed. Default is a rare event, so defaults take time to appear; consider early indicators such as delinquency, but validate them against eventual default.
What goes wrong
- Ignoring selection. Evaluating increases from historical, rules-based decisions confuses the policy with the effect.
- Optimising on revenue. Line increases that raise balances can look excellent for several months and then turn when losses emerge. Match the evaluation horizon to the loss horizon.
- Averaging across heterogeneous accounts. Net value turns negative for a subset hidden inside an apparently profitable band. Split bands, then check that the split holds out of sample.
- Underpowered tests. A small pilot produces a confident-looking number that is mostly noise, as the band A result shows.
- Treating the model as static. Drawdown and risk change with the economic cycle and with pricing. Re-estimate and re-test on a schedule.
- Forgetting decreases. Unused lines in deteriorating segments carry real risk, and a line management strategy should include both directions.
An illustrative project
This is a synthetic scenario for illustration, not a description of real client work, and no results are claimed. Imagine a card issuer that raises limits each quarter using a single score cut-off. The team is asked whether the policy earns its keep. The approach is to randomise a small hold-out in each score band, measure drawdown and delinquency over twelve months, build the per-account net value model above, and then solve for the allocation that maximises expected value under an exposure budget. The decision supported is the choice of which bands receive increases and how large the exposure budget should be, with the control group left in place so the policy keeps being measured.
How to start
- Write down your objective: value per unit of exposure, over which horizon.
- Build a table of past limit changes with outcomes, and note how each was selected.
- Add a randomised hold-out to the next increase cycle, stratified by risk band.
- Estimate drawdown and default separately, then combine them in the net value formula.
- Fix the constraints with Finance, Risk and Compliance before optimising.